A parishioner objected to a proposal to introduce a new lighting scheme into the 13th century Grade II* church, but he chose not to become a party opponent. The Chancellor considered the parishioner's eight grounds of objection and considered that none of them provided a reason for refusing the grant of a faculty.

A faculty was sought for major re-ordering of an unlisted Victorian church, including relocation of the font, replacement of pews with chairs, re-flooring, new kitchen and toilets and relocation of a screen. The Church Buildings Council and the Diocesan Advisory Committee approved the proposals, and Historic England supported the Victorian Society, who approved the proposals subject to agreed amendments. A faculty was granted.

A faculty had been granted in 2016 to authorise extensive reordering works in the church. The faculty had authorised (inter alia) solid wood Rosehill chairs. The petitioners now wished, after the extended period for completion of the works had elapsed, to introduce Alpha chairs with wooden backs and upholstered seats. The Chancellor refused to grant such variation to the faculty granted in 2016, so as now to allow part-upholstered chairs, but indicated that he would be prepared to consider a further application for variation in respect of one of the alternative solid wood chairs suggested by the church's inspecting architect prior to the 2016 faculty.

The intention of the proposals was to improve on a scheme of reordering in 1988, by providing at the west end of the church a larger circulation area near the main door; meeting space; toilet facilities for the disabled; an entrance meeting disablility standards; a kitchen and servery; and a storage area. The Chancellor was satisfied that the majority of the works would result in an improvement to the interior of the church and he granted a faculty for all the items, with the exception of the proposed wheelchair lift at the entrance, which he connsidered 'would have a somewhat utilitarian feel to it'.

Faculty granted for construction of a single storey extension to incorporate a kitchenette and disabled toilet, and associated works.

The proposals included: (1) replacing the iron gates to the porch with glazed sliding doors; (2) new porch lighting and glazing of one porch window to match the other; (3) relocation of the internal 1906 wooden lobby to the west end of the south aisle and its conversion to storage space; and (4) removal of a pew in the south aisle to allow the relocation of the lobby; and (5)) replacement of the ramp inside the lobby with a new ramp with handrails. The Chancellor granted a faculty for items (1) and (2), but not item (3) (the relocation of the lobby) as proposed, in consequence of which items (4) and (5) were not approved.

The petitioners wished to remove the church pews and replace them with ICS stacking chairs of solid oak with an oak veneered plywood seat and back. The Victoria Society objected to the proposal, but was not a party opponent. The Chancellor was satisfied that a very low degree of harm to the church would result from the removal of the pews, which would be substantially outweighed by the public benefit that would be achieved by their replacement. He accordingly granted a faculty.

The petition proposed the reordering of the west end of the church, including: adding a ceiling to the vestry; replacing the current extension with a larger extension containing two toilets and baby-changing facilities; removing one row of pews in the nave; and removing two pews under the organ gallery and installing in their stead a servery/kitchenette and seating area; and works in the south aisle by way of the repositioning of an effigy. The Georgian Society and the Society for the Protection of Ancient Buildings objected to the removal of two pews from under the organ gallery. The Chancellor was satisfied that any harm caused by the proposed works to the church’s special significance was only moderate, and he granted a faculty.

A large reordering project was proposed, including the introduction of a lavatory in the tower, raising the ringing floor, a gallery in the tower overlooking the nave, a servery unit at the west end of the north aisle; moving the font to the north east corner of the nave and replacing the pews with Howe 40/4 (or

equivalent) chairs to allow for more flexible use of the nave. Two members of the congregation objected to the replacement of the pews and the moving of the font. The Chancellor granted a faculty, subject to a condition that no work should commence until 75% of the cost of the work, or of a particular phase, had been raised or promised.

The Chancellor granted a faculty for (1) the removal of two rows of pews at the west end of the church, in order to create an area of more flexible use; (2) the provision of kitchen facilities in the vestry; (3) a hatch in the vestry screen; and (4) various electrical works.

×