Judgment Search

Downloads

Click on one of the following to view and/or download the relevant document:

Alphabetical Index of all judgments on this web site as at 1 October 2022

Index by Dioceses of 2022 judgments on this web site as at 1 October 2022

Extensions

Display:

Faculty granted for the construction of an extension to the north side of the church. This judgment follows on from the judgment in Re St. Mary Kenardington [2013] Morag Ellis Comm. Gen. (Canterbury).

The Faculty Petition sought authority to construct a toilet block in the churchyard and an extension to the north side of the church. When the Commissary General visited the site, building work had already begun without Faculty. Faculty granted for the construction of the toilet block. Work on the extension to be stopped until further order. An archaeological report to be filed.

The petitioners wished to erect an octagonal extension with a link to the existing north door of the church to provide facilities for a clergy vestry, a meeting room with mezzanine, 2 WCs (including one for disabled), a kitchenette, choir robe store and general storage. This would involve building over graves and the moving of four upright stones and four kerb sets. Objections were received from six people whose family graves would be affected by the proposals. Faculty granted. Chancellor: "... in my judgment the petitioners have demonstrated a clear need for the proposed extension and I am satisfied from all the information available that the nature, design and location of the building are all entirely appropriate and fulfil the intended purpose. It is a matter of regret that established grave sites and markers will be affected by the erection of the new building, but I have reached the conclusion that the proposed extension is necessary if the mission and functioning of the church is to be maintained and developed and that the benefits for the church and for all who use it outweigh the adverse impact on the grave sites."

The Chancellor granted a faculty for a single storey extension to the 14th century Grade II* church to house a lavatory, a vestry for the clergy and choir and storage for robes; the provision of a kitchenette at the base of the west tower; the repositioning of a screen; and the re-siting of a memorial stone.

The petition proposed extensive reordering works, both inside and outside the church, in order to adapt the church for use as a multi-purpose building with a dedicated worship space, an outdoor activity and play area and a Youth Hub extension. The Victorian Society, whilst not wishing to be a party to the proceedings, objected to the length of the proposed extension and its wood cladding. The Chancellor granted a faculty, being satisfied that the missional advantages of the proposed works outweighed the harm alleged.

The Chancellor granted a confirmatory faculty for the replacement of a modern octagonal entrance vestibule to the church by extending the front entrance and providing information panels about the Loseley Chapel; incorporating the former outside gravel area and south wall of the Chapel into an internal, informal meeting space; expanding the current kitchen area and the installation of underfloor heating throughout the new entrance and reception areas, together with reglazing and the renewal of the heating and ventilation system.

There was a proposal to build an extension to the north-east corner of the church, which would involve the demolition of a 19th century vestry. There were 16 parties opponent and many other objectors by letter. The need for the extension was as a result of the sale of a building opposite the church, which had been used by many church groups, but had fallen into great disrepair. The Chancellor was satisfied that the proposed extension would not result in harm to the significance of the church as a
building of special architectural or historic interest, and he accordingly granted a faculty.