Ecclesiastical Law Association

Ecclesiastical Law Association

Re Christ Church West Wimbledon [2016] ECC Swk 3

There were to petitions. The first related to the construction of a new church hall linked to the south porch; removal of internal draught lobby; external lighting; tree felling, landscaping and signage. The second sought the necessary authorisation for the Petitioners (the Incumbent and Churchwardens) to enter into a contract with the Diocese of Southwark for the transfer of a small piece of land to the south west of the church building which was required for part of the proposed new structure. The Victorian Society objected to the new hall being constructed so close to the Grade II church, but was not a party opponent. The Deputy Chancellor determined that a Faculty should be granted.

File Size: 267.1 KB
File Type: application/pdf