In 2016 the Archdeacon discovered that a toilet, within a roofless cubicle, had been installed without the grant of a faculty in the church vestry and that the arrangements for the drainage of sewage from the toilet had involved excavation into the ancient churchyard. It was later discovered that a kitchen sink unit and a wall mounted electric water heater had been installed without faculty inside a cupboard at the base of the church tower. All of the works were said to be of poor quality. The Archdeacon, the Secretary of the Diocesan Advisory Committee ("DAC") and the Diocesan Registrar endeavoured to get the District Church Council ("DCC") to carry out restoration works. Eventually a faculty petition was filed for the restoration works. The Chancellor granted a faculty for the church to be restored to its former condition and directed that the DCC should pay the Registry costs and the costs of the DAC employing counsel to advise in the matter.

The works described in the petition were: 'Provision of a new café in the west end of the church including new freestanding café servery and food prep kitchen; integrated chair store; new services for the above (water, power, drainage); new glazed door to south porch; new loose café furniture and welcome desk.' The Victorian Society had reservations about the proposed chair storage, and suggested that the open servery could be replaced by one capable of being closed. The Chancellor, however, was satisfied with the two proposals. The Victorian Society also suggested that the choice of chair for the café area could be linked with a more holistic reordering of the seating in the church. The Chancellor granted a faculty subject to conditions, including a condition that within five years the parish should put forward proposals for replacing the existing folding chairs in the body of the church.

The petition contained two proposals. The first was for the installation of an 'Eco Loo', for which the Chancellor granted a faculty. But he declined to grant a faculty for the removal of a number of pews from the Grade II* church, in order to create an area for functions other than services. The amenity societies objected to the removal of the pews and the Chancellor was of the opinion that no adequate justification for the proposals had been made.

The Faculty petition proposed a major reordering of a Grade II* church. The Victorian Society was a party opponent. The Chancellor approved the proposals generally, concluding that the benefits would outweigh any harm to the church. However, he was not prepared to approve the proposed red upholstered chairs. He therefore gave a stay of proceedings for 28 days, to allow for the petitioners to consider the judgment and put forward an alternative proposal for the chairs, which the Chancellor might find acceptable.

The faculty petition proposed a major reordering of the 13th century church, including removal of most of the pews and installation of a kitchen, which would support a proposed 'cafe hub'. The rationale for the proposals was to stem the decline of attendance at the church and encourage further church and community use, rather than risk closure. The Chancellor was satisfied that a good case had been made for the changes and granted a faculty for all but one item in the proposals.

An extensive programme of reordering was proposed. The sticking points were the removal of the pews, the replacement of the flooring and the introduction of underfloor heating. The Chancellor approved the replacement of the flooring and introduction of underfloor heating, but he was not satisfied that the petitioners had made an adequate case for the complete removal of the pews.

An application had been made for a restoration order following the removal of four pews and replacement of some pew platform boards. Although an application had been made for an Archdeacon's Licence for temporary re-ordering, the work had been done before the Licence had been issued, and therefore before the conditions attached to the Licence were known. The pews had received some minor damage during the course of their removal. The Commissary General decided to make a restoration order in respect of the pews (but not the platform boards), but suspend it for an initial period of four months to give the PCC an opportunity of consulting the amenity societies and the Diocesan Advisory Committee and applying for a Faculty to authorise a permanent re-ordering.

The proposals were to replace the pews with upholstered chairs; new floor coverings; a servery; and a disabled access toilet and baby-changing area. Historic England did not favour the complete removal of the Victorian pews and had concerns about the choice of chair. The Deputy Chancellor granted a faculty for the items, providing that the stackable chairs to replace the pews in the north aisle should be Howe 40/4 unupholstered chairs, and the two back nave pews shoud be put into storage.

Major re-ordering was proposed. Objection by the Victorian Society in relation to the physical and spatial impact of the scheme as a whole. Faculty granted.

The Chancellor refused to grant a faculty for the removal of a number of short side aisle pews as, in applying the guidelines in Re St. Alkmund Duffield, he found that the petitioners had failed to provide a clear and convincing justification for the removal of the pews. He stated that if the PCC wished to remove the pews they should produce a more comprehensive plan for re-ordering the interior of the church. The Chancellor refused to grant a faculty for the removal of a number of short side aisle pews as, in applying the guidelines in Re St. Alkmund Duffield, he found that the petitioners had failed to provide a clear and convincing justification for the removal of the pews. He stated that if the PCC wished to remove the pews they should produce a more comprehensive plan for re-ordering the interior of the church.